Type: Task
-
Status: Closed (View Workflow)
-
Priority: Minor
-
Resolution: Fixed
-
Affects Version/s: 2.14 Larks
-
Fix Version/s: 3.0 Larks
-
Labels:
-
Sprint:3.0 Larks, 2.14 Larks, 3.2 Larks
This is a first step of connecting of automated load tests to prject CI pipline.
Specific actions to take:
- Add to the load-tests subproject a command line option that will allow to choice which load test plan(s) to run: Baseline, main Test Plan or all present in the tests catalog (that is a current behavior).
- Configure existing JC. Run Load tests job to run only the BaseLine load test plan.
- Tune the Threshold setting of the JC. Run Load tests job to mark the job result as Unstable if considerable problems appear during test.
- Call JC. Run Load tests job from the JC. To Performance pipline job to perform Baseline load tests as a part of pipeline.